Jamshedpur, Dec 17: A new 450 mm diameter sluice valve will be installed on delivery line of Sakchi new water on 18.12.2013.
This job will commence at 3:00 PM on 18.12.2013 and shall be completed at 11:00 PM on same day. During this period of shutdown there will be no pumping of drinking water from Water Treatment Plant to Sakchi Water Tower.
As a result of which drinking water supply during evening time shall remain suspended and mid day supply shall be provided from 11:30 AM to 1:30 PM on 18.12.2013 at areas where drinking water is being supplied two times a day.