Tata Steel UISL inaugurates 3 MGD water treatment plant in Jamshedpur

Jamshedpur, May 9: To meet the growing consumption for drinking water, Tata Steel UISL has constructed a 3 Million Gallon per Day (MGD) water treatment plant at Ramadhin Bagan, near ISWP Transportation Park. This WTP will be catering to drinking water needs of various locations like Namda Basti, Mishra Bagan , JEMCO Azad Basti, Gowala Basti, Ramadinbagan, Manifit Basti, Mohananda Basti,etc.

The plant was inaugurated by Chanakya Chaudhary, Vice President, Corporate Services, Tata Steel and Ritu Raj Sinha, Managing Director, Tata Steel UISL today.

The plant is equipped with the latest technologies and equipment, which ensures the highest level of efficiency and reliability. Disinfection done through Electro-chlorination plant, thus eliminating the usage of liquid chlorine. The wastewater generated in filter beds is recycled back to the inlet zone.The plant is equipped with a laboratory facility for physico-chemical as well as micro-biological analysis. The automation system consists of PLC controlled Filter Bed, Pump house and Clarifier systems

The inauguration ceremony was attended by Pranay Sinha, Chief, Corporate Services, Tata Steel, Capt. Dhananjay Mishra, Sr. General Manager, TSUISL, Sanjiv Kumar Jha, EIC (Water & Wastewater Services),TSUISL, Senior leadership teams from Tata Steel and Tata SteelUISL. The plant is expected to play a critical role in meeting the growing demand for purified water in the region and support the sustainable development of the industrial sector.

1 COMMENT

Leave a Reply

Stay Connected

5,000FansLike
2,000FollowersFollow
8,000FollowersFollow
- Advertisement -

Latest Articles